What are the methods of Bored Piling?
BORED PILE METHOD Bored piles are the concrete structures installed in mudrocks to transmit the heavy structural loads onto the rock head Strata. Pre-requisites of bored pile construction. Determining soil parameters and preparing a soil report is the very first step of the process. The different soil parameters for selecting the appropriate method for the bored piles- dry pile, wet pile, or cased pile method. The selection of pile construction method primarily depends on- Soil conditions: The soil condition plays a vital role in the stabilization of boreholes. The contractors need to check whether the soil is denser or loosen to decide the method of the bored piling. The denser rock is not easy to penetrate and thus needs a rigorous method of bored piling. The loosen soil requires extra effort, they involve the use of slurry, made up of different polymers to stabilize the soil condition. Evacuation of soil needs to be prevented, don’t let the soil flow into the pile sleeve...